HomeWish ListForwardMonthly LogMaintenance Post a Comment
Chassis ConstructionFront SuspensionEngine SubframeRear SuspensionExhaustElectrical
Reverse Operation Other StuffFront TrunkEngine CompartmentExteriorInteriorLinks
ServicesContact Me

Other Projects:
Vortex 3-wheel Vehicle
17' Wind Turbine
Bradly GT II Kit Car
1966 Ford Fairlane GT
Spinning Wheels


Search this site:
 
Web www.briery.com

Links to other monthly logs: 12/2004 1/2005 2/2005 3/2005 4/2005 5/2005 6/2005 7/2005 8/2005 9/2005 10/2005 11/2005
12/2005 1/2006 2/2006 3/2006 4/2006 5/2006 6/2006 7/2006 8/2006 9/2006 10/2006 11/2006
12/2006 1/2007 2/2007 3/2007 4/2007 5/2007 6/2007 7/2007 8/2007


10/2005 Log

This page logs my progress of the Vortex build for the month of October 2005

Date Costs Activity
10/3/2005   One week and I am getting to know my Prius even better, and have to say even more impressed with it...

Still averaging between 48-49mpg. I would be happy to field any questions about the Prius, just email me.
10/09/05  

I had a rare day in which I was able to get back to the Vortex. I made up the bracket which holds on the rear brake caliper. Here is a picture of the bracket,. I had to profile it a bit to fit the caliper better.

Here is the bracket welded onto the swing arm. I will need to change the bolts used to hold the pulley/rotor on the axle as the heads of the hex bolts are causing some interference with the brake caliper.

I also put the drive pulley onto the intermediate shaft so that I could get an idea if the rear adjusting slots were sufficient. It looks that the slots were made long enough, if I get a lot of streatch from the belt I can always remove the swing arm and enlongate them some more.

Month
12/2004
1/2005
2/2005
3/2005
4/2005
5/2005
6/2005
7/2005
8/2005
9/2005
10/2005
11/2005
Costs
$1238.00
380.00
218.50
1487.37
2115.97
445.33
321.94
636.39
(67.00)
103.00
0.00
12.00

Month
12/2005
1/2006
2/2006
3/2006
4/2006
5/2006
6/2006
7/2006
8/2006
9/2006
10/2006
11/2006
Costs
$501.38
555.70
648.26
315.90
356.84
410.00
479.65
187.93
1113.53
503.78
1445.80
83.60

Month
12/2006
1/2007
2/2007
3/2007
4/2007
5/2007
Costs
$763.86
119.85
199.10
288.66
119.40
239.00
Basic Project Done


Links to other monthly logs: 12/2004 1/2005 2/2005 3/2005 4/2005 5/2005 6/2005 7/2005 8/2005 9/2005 10/2005 11/2005
12/2005 1/2006 2/2006 3/2006 4/2006 5/2006 6/2006 7/2006 8/2006 9/2006 10/2006 11/2006
12/2006 1/2007 2/2007 3/2007 4/2007 5/2007 6/2007 7/2007 8/2007




If you find this site useful and would like to support it, you can do so simply by clicking the button below and donating whatever you like.
To donate you can either use your PayPal account or a credit card (using secure authorization). Donations can be for as little as $1.00

© 2005 Briery Mountain Enterprises, Creative Commons "Some Rights Reserved" Except where otherwise noted, this site is licensed under a Creative Commons License